Boeing Begins 737 MAX Certification Flights
Boeing has begun flight testing their troubled 737 MAX after it has spent more than a year grounded, as a result of two fatal crashes that left 346 people dead. From Boeing Field in Seattle a 737 MAX 7, BOE701, took to the skies at 09:54 local time with the intention of proving to the Federal Aviation Administration (FAA), and other safety bodies, that the aircraft is safe to fly. The aircraft tracked 120 nautical miles to the southeast around … Continue reading Boeing Begins 737 MAX Certification Flights
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed